一个可以免费发布合法广告和外链的外贸论坛

外贸论坛

 找回密码
 立即注册
搜索
热搜: 活动 交友 discuz
查看: 46|回复: 0

Komar验厂的简介|Komar验厂管理手册

[复制链接]

78

主题

118

帖子

332

积分

中级会员

Rank: 3Rank: 3

积分
332
发表于 2019-5-24 13:42:00 | 显示全部楼层 |阅读模式
创立于 1908年,Komar 是全球首家将尼龙和人造丝纤维引入短纤织物的服装公司。创立至今,Komar 与零售伙伴在全球推出了近 100个生活方式品牌,在全球 12个不同的国家设有工厂,并在美国和欧洲设有分销中心
Komar requires that all shipments meet and pass an Audit by our Quality Team. If our Customers require
3rd Party Audits, the shipment must still pass KOMAR audit before being released.
Our QA Process is as follows:
* Komar Audit Booking form must be submitted to the local Office at least 14 days in advance and
Audit Date least 3 days prior to exit factory date (X-factory). Garments must be produced and
audited to where the PO was written.
* In-Line Inspection at least 20% of PO quantities in full sizes and full colors.
Note: Komar QA personnel must have access to Warehouse, Fabric Inspection area, Molding, Knitting,
Printing, Sewing floors, etc. If your policy does not allow KOMAR personnel in your work area you must
receive written approval from our EVP of Production/Sourcing before costing any product for Komar.
* Final Inspection at least 80% of PO quantities packed in complete size/color.
        o  QC file must have approved PP/TOP samples and appropriate Test Reports where needed
           along with email approvals of any deviations from standard requirement.
* Final Inspections cannot be done on the exit factory date as this does not allow time for re-
inspections if needed.
* Night time inspection(s) after 6 PM are subject to approval and must be pre-arranged.
* Failed Audits can result in HOLD in shipments until audit gets an override from NY Office or Local
head of QA. Any delays will be the responsibility of the Factory.
The Final audit is composed of three critical sections and a failure in one is a result in a failed audit. The
three areas are as follows:
1. Garment Inspection at an AQL 2.5 Level II Normal Single Sampling Plan for Majors and an AQL 4.0 Level
II Normal Single Sample Plan for Minors for garment Inspection.
Chart 1: Sample Size Code Letters
Chart 2: Single Sampling Plan for Normal Inspection
1. Measurements: We will do a 10% audit of all Key Points. If there is a consistent Point of Measure we
will extend our audit sampling to determine severity and make a determination of there is an issue
and a sort will be required or not.
3. Packing Audit: We will audit 10% of the packed cartons for the Shipment. There are critical defects
where there will be zero tolerance. Zero Tolerance includes
* Improper Pre-Packs, Wrong Size in Carton.
* Missing Hangtags- price tickets
* Missing care Content Label
* Un-scannable Barcodes or incorrect Barcodes
Komar QA along with the Regional office Manager can hold a shipment until audit gets an override from NY
Office or Local head of QA. Any delays will be the responsibility of the Factory.

验厂:BSCI/sedex/ Disney/Wal-Mart 认证:GOTS/OCS/GRS/RCS/RDS
成为最懂中国工厂管理的咨询公司----验厂宝  Seven 18550451915  QQ1770581900
友情提示:回帖是一种美德,也是对楼主辛勤付出的尊重和支持!
  • A.出于对楼主的尊重以及版规要求,请礼貌回帖,请不要纯表情、灌水、重复内容刷屏和广告。
  • B.本论坛禁止发表一切违反中华人民共和国法律的言论。
  • C.本站所有帖子属会员个人意见,与本站立场无关。帖子内容版权归属作者所有,如是转贴版权归属原作者所有,其他单位或个人在使用或转载帖子内容时须征得帖子原作者的同意或注明内容原出处。
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

Archiver|手机版|小黑屋|外贸论坛

GMT+8, 2024-5-31 11:07 , Processed in 0.096603 second(s), 23 queries , Gzip On.

Powered by Discuz! X3.4

© 2000-2023 外贸论坛

快速回复 返回顶部 返回列表