现经手一个输变电站工程项目,地点在非洲。
500KV输变电建设以及300KM高压线架设, 最好是已经在非洲有工程的公司,要求电力工程建设一级资质,有兴趣的电建公司速速联系。
Section 1
Complete both the first and the second diameters of the existing substation by adding the necessary three 500 kv breakers ,disconnectors, current transformers ,voltage transformers, and arrestors to enable the connection of the new line
Section 2
Approximately 270 km of 500 kV single circuit steel lattice transmission line between the existing 500/220/33 kV Substation and the existing 500/220/33 kV Substation
Each phase will consist of a bundle of four sub-conductors in square formation and at a spacing of 450 mm. Each sub-conductor of the main line will be an aluminium conductor steel reinforced (ACSR) with 282 mm2 aluminium area and code name “Dove”. There will be two over-running earth conductors, one of which will contain fibre optic strands